Included:
• Install the charger
• Construction of a trail up to 25 meters (construction of power supply and electrical protection)
• Installation materials required for installation and fastening only (fixing screws, plastic protective tube, etc.)
• Commission the charger
• Charger configuration
• Charger testing
• Remuneration
Not included:
• Construction or earthworks (eg paving, concreting)
• Architectural works (eg reinforced concrete, brick wall demolition)
• Repair of wall defects (eg plastering, painting)
• Network expansion (low performance)
• Measuring site standardization
• Touch protection inspection and measurement
• Create an installation plan
• Drop-off fee
• Other unspecified item